Power
Volt
Hybrid containerised power unit, generators, light towers.
approx. 250 kWh / 100 kW*
Concept illustration · not a final product model
Preparedness capacity · Romania and Hungary
Power, water and shelter for the first 72 hours, plus protective equipment for the crews who respond. Delivered in containers and kits, ready to connect, with local commissioning, training and service.
72 h · power · water · shelter
You are not buying a box. You are buying the first 72 hours.
| Not this | But this |
|---|---|
| Generator | Power for the hospital operating theatre for 72 hours |
| Water purifier | Drinking water for an isolated village |
| Tent | A roof over 100 evacuees, that same evening |
| Pump | Emptied cellars and working culverts |
| Hi-vis vest | A crew that works safely at night |
One connector standard, one team from commissioning to service.
01 · Capacity
Power
Hybrid containerised power unit, generators, light towers.
approx. 250 kWh / 100 kW*
Water
Water purification container, water tanks, mobile sanitation.
approx. 50 m³/day*
Shelter
Modular camp: tents, beds, heating, field kitchen.
approx. 100 people*
Flood pumping
Trailer flood pump, slurry pumps, mobile flood barriers.
approx. 1,000 m³/h*
* indicative, final values from manufacturer datasheet
02 · Crew
Multi-norm clothing, footwear, head protection and water-rescue gear, assembled as a crew kit.
Supplied with the manufacturer's existing EU conformity documentation (Regulation (EU) 2016/425).
03 · 72
Radio, torch, power bank, water purification, first aid. Also offered to municipalities for bulk purchase in public-preparedness programmes.
Single connector standard, one commissioning, one service contract, one responsible party.
Versus catalogue resellers
We deliver a system, not a pallet.
Versus Western manufacturers
OEM pricing, service close by.
Versus emergency rental
Capacity in place before the crisis.
We look at the site, the loads and the realistic emergency scenarios.
We configure the system and hand over the technical and conformity documents for procurement.
We commission on site and drill operation with your team.
Service, inspections, optional leasing or standby subscription.
We work with every entity responsible for people, services or infrastructure in the first 72 hours. Domains grow as we launch new specialities.
Crew · Volt · Flux
Emergency inspectorates (ISU), disaster management directorates, volunteer services
Responder equipment, lighting, mobile power for command posts.
Request a presentationCamp · Aqua · 72
Municipalities, towns, communes
Shelter and drinking water for the community, household preparedness programmes.
Request a presentationVolt · Aqua · Camp
County councils, prefectures, ministries, agencies
Strategic stockpiles, regional capacity, tender specifications.
Request a presentationVolt · Aqua · Flux
Water, power, gas and district-heating operators
Service continuity: backup power, water treatment, pumping.
Request a presentationVolt · Aqua
Hospitals, clinics, care homes
Uninterrupted power for operating theatres and 72 hours of drinking water.
Request a presentationFlux · Crew
River basin authorities, forestry, protected areas
Flood pumping, dyke work and safe field crews.
Request a presentationVolt · Crew
Roads, rail, airports, ports, bridges
Lighting and power at the incident site, crew safety at night.
Request a presentationVolt · Crew · Flux
Chemicals, energy, telecoms, data centres, logistics
Continuity plans, backup power, equipment for in-house teams.
Request a presentationCamp · 72
Schools, universities, dormitories, sports halls used as shelters
Equipped evacuation centres, preparedness kits for pupils and families.
Request a presentationVolt · Aqua · Camp
Gendarmerie, police, border police, military units
Mobile logistics capacity: power, water, temporary accommodation.
Request a presentationCamp · Aqua · 72
Associations, volunteers, faith-based groups, local action groups
Shelter and water for evacuees, kits for vulnerable families.
Request a presentationVolt · Aqua · Crew
Construction, agriculture, tourism, event organisers
Temporary power and water, protective equipment for staff.
Request a presentation72
Families, homeowners' associations
The family kit for the first 72 hours.
Request a presentationWe help you specify equipment for your project application.
We do not promise funding: awards are decided by the programmes' managing authorities.
The European Commission's Preparedness Union Strategy, adopted on 26 March 2025, sets the goal that people can be self-sufficient for at least 72 hours in a crisis.
Source: European Commission, 26 Mar 2025Interreg VI-A Romania–Hungary funds cross-border projects.
Source: interreg-rohu.euUnder HUSKROUA NEXT, EU co-financing can reach up to 90% at project level.
Source: huskroua-cbc.euPilot partners
If your organisation would like to trial the system at a real site, tell us.
Tell us what you are preparing for. We reply within one working day.
contact@kodrana.eu